As viewed in the determine beneath, ongoing auger is accustomed to drill the borehole, raise up drilled soil, and pour concrete when the auger is moved up. Consequently, the borehole will not have to have casing or hydrostatic tension to prevent harm to the borehole wall. The usage of a https://cast-in-situ-piles82470.thekatyblog.com/31479368/how-cast-in-situ-piles-in-dhaka-can-save-you-time-stress-and-money