3. Following rig positioning, generate the casing into the bottom. Travel metal casing to a minimum a depth of 1 m down below the bottom level to take lateral hundreds and movements at web-site. The metal casing also fight problems resulting from groundwater in the course of piling. Targeted visitors https://cast-in-situ-piles-in-dha15789.ivasdesign.com/54204478/about-cast-in-situ-piles-in-bangladesh