Penmann successfully delivered a tailored HVAC upgrade at Nutricia’s Liverpool facility, implementing a purpose-built ventilation and climate control system engineered to meet strict hygiene and production standards. The scope included the complete lifecycle delivery of high-specification HVAC systems across civil, Medium Care (MC) and High Care (HC) areas. Based on https://bookmarkcolumn.com/story20456100/penmann-ltd-finalises-specialist-hvac-installation-for-the-liverpool-based-nutricia-facility-in-line-with-fsi-phase-1-and-2